Digital Repository

Evaluating and Ameliorating Visual Impacts of Waterfalls Hydropower on Holy Sites

Show simple item record

dc.contributor.author Potkin, A.
dc.date.accessioned 2015-06-12T04:46:06Z
dc.date.available 2015-06-12T04:46:06Z
dc.date.issued 2015
dc.identifier.citation Potkin, Alan 2015. Evaluating and Ameliorating Visual Impacts of Waterfalls Hydropower on Holy Sites. Heritage as Prime Mover in History, Culture and Religion of South and Southeast Asia, Sixth International Conference of the South and Southeast Asian Association for the Study of Culture and Religion (SSEASR), Center for Asian studies of the University of Kelaniya, Sri Lanka. (Abstract) p.04. en_US
dc.identifier.isbn 978-955-4563-47-6
dc.identifier.uri http://repository.kln.ac.lk/handle/123456789/8207
dc.description.abstract There is no sharp line between “natural patrimony” and “cultural heritage” and commonly, sites or objects of primarily natural provenance may come to be ascribed with religious significance. Great cataracts - and sometimes even modest-sized waterfalls - are often considered as holy places and frequently are the venues for erecting shrines and temples. According to the original concept, the Upper Kotmale Hydroelectric Project (UKHP) in the tea country near Talawakelle, Sri Lanka was designed to terminate five waterfalls. Among the five waterfalls at least two were the sites of minor shrines and the third, the setting of a highly revered - amongst the Plantation Tamil community – a miracle temple. Initially, both the Japanese funders and the national project proponents were resistant to the concept of “aesthetic releases” which should have at least partially or intermittently conserved the beauty and spiritual character of waterfalls otherwise being sacrificed to energy development, but which would have necessarily entailed significant “opportunity costs”: i.e., foregone revenues for ungenerated and unsold power. The controversy over UKHP, largely on the waterfalls issue, delayed its construction for fifteen years, but it was eventually approved and quite recently completed, and the project as - implemented included consideration of aesthetics and cultural sensitivities. We will be presenting the original image archive produced in 1991 for the required environmental documentation, but also new interactive digital media from our December, 2013 post-facto evaluation of the UKHP’s actual visual impacts. en_US
dc.language.iso en en_US
dc.publisher University of Kelaniya en_US
dc.title Evaluating and Ameliorating Visual Impacts of Waterfalls Hydropower on Holy Sites en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Digital Repository


Browse

My Account